Fire prevention

[PA]: Public Administration.

August 2025 – December 2025

[PA] Project management for extraordinary maintenance works on two fire-fighting pump units for the hydrant network serving the primary, secondary and nursery schools in Pianella town centre (PE).
ospedale ss annunziata chieti

November 2023 – July 2025

[PA] Preparation of the fire safety project assessment, in my capacity as Group Leader of RTP, for activity 68.5.C: Hospital with over 100 beds for the "SS. Annunziata" Hospital in Chieti (CH), located at Via dei Vestini – Loc. Colle dell'Ara.

April 2025

Consultancy services for the verification of calculations and the selection of a pump unit for a hydrant-based fire-extinguishing system serving the DSB in Viale De Gasperi, San Salvo (CH).

September 2024 – March 2025

Preparation of a fire safety assessment and a fire safety SCIA for activity 49.2.B (a 566 kW generator set) and preparation of a fire safety SCIA for activity 13.1.A (a diesel fuel distribution point serving a quarry) located at Via Nucleo Collelungo, 7 in the municipality of Capestrano (AQ).
istituto comprensivo atri

April 2024 – December 2024

Drafting of a fire safety assessment for activity 67.4.C: schools of all kinds, levels and types with over 300 people present, for the Comprehensive School situated at Viale Umberto I, 3, Atri (TE).
museo cascella pescara

December 2024

Preparation of the final design for fire safety, emergency lighting, EVAC, smoke detection and ventilation for the Cascella Museum, situated at Viale G. Marconi, 45, in Pescara (PE), on behalf of Avilo Engineering srl.

September 2024 – December 2024

Drafting of a request for a fire safety assessment for three installations (49.1.A): a 40 kW generator set for RFI SPA, located at the stations in the province of L'Aquila (AQ) at Scurcola Marsicana, Tagliacozzo and Carsoli.
stazione centrale pescara

August 2024

Preparation of the fire safety assessment and fire safety SCIA for activity 74.2.B: a 540 kW generator set serving the central station in Pescara (PE) on behalf of Mr Vivaldo De Marinis.

July 2024

Preparation of a fire safety assessment for activity 74.1.B: a 400 kW heating plant serving the Comprehensive School at Viale Umberto I, 3, Atri (TE).
bretella ferroviaria sulmona

June 2024

Preparation of a fire safety assessment for activity 49.1.A: a 40 kW generator set, on behalf of RFI SPA – New railway link road in Via Paradiso snc, Sulmona (AQ).
stazione centrale sulmona

May 2024

Preparation of a fire safety assessment for activity 49.1.A: a 96 kW generator set, on behalf of RFI SPA – Sulmona Central Station forecourt (AQ).
attivita rivendita ingrosso bisceglie

January 2024

Fire safety assessment for a wholesale business dealing in sanitary fittings, situated at 230 Via M.R. Imbriani, Bisceglie (BT), on behalf of LANDBAU srl.
sporting club francavilla al mare

January 2024

Preparation of a fire safety assessment for the Sporting Club Francavilla al Mare (CH).

September 2023

Consultancy services for the development of a new fire extinguisher for CSQ Estintori in Spoltore (PE).

July 2023

Feasibility study for a Wi-Fi fire detection system for the Municipality of Pianella (PE).
scuola materna cso sergio cosmai bisceglie
scuola materna bisceglie

May 2023 – June 2023

[PA] Thermal calculations (summer and winter heat demand), drafting of a technical report in accordance with Law 10/91, Energy Performance Certificate, and final/detailed design of mechanical and fire-extinguishing systems for a nursery school as part of the PNRR scheme on Corso Sergio Cosmai in Bisceglie (BT) on behalf of LANDBAU srl.
chiesa del volto santo

January 2023

Drafting of a fire safety compliance renewal report for the heating plant serving the Church of the Holy Face at C.da Cappuccini, 19, Manoppello (PE).
deposito linde montesilvano

November 2022

Professional consultancy on fire load calculations for the Linde warehouse located at Via Danubio, 5, Montesilvano (PE).
locale arca c8

October 2022

Preparation of a technical fire safety report to determine the fire load within the premises located at Viale Europa, 128, Spoltore (PE), in the Arca C8 block of flats, managed by Linde Medicale srl.
casa di riposo cassiopea pescara

August 2022

Drafting of a report on bringing the 'Cassiopea' care home, situated at 51 Via Sacco, Pescara (PE), into compliance with fire safety regulations.

March 2022

Drafting of the fire safety renewal plan for the heating plant at the F. Petrarca School in Civitaquana (PE) on behalf of Engineer Katia Colalongo.
scuolaf petrarca civitaquana

July 2021 – August 2021

Final/Detailed Design for fire safety upgrades to the F. Petrarca School in Civitaquana (PE) on behalf of Engineer Katia Colalongo.
palazzo pianella

March 2021 – July 2021

Design for extraordinary maintenance works and fire safety measures for the town hall of the Municipality of Pianella (PE).

December 2020 – March 2021

Drafting of a project assessment report in accordance with the new Fire Prevention Code for a paint storage facility located at Via Italia, 118, Collecorvino (PE).
condomini quercia e acero montesilvano

November 2020

Drafting of a GSA (Condominium Management Agreement) for fire safety compliance in accordance with the Decree of 25 January 2019 for the 'Quercia' and 'Acero' blocks of flats situated at Via Fosso Foreste, 10, Montesilvano (PE).
victoria srl estintori

November 2020

Drafting of a sworn expert report for the valuation of 43 fire extinguisher approvals for the company A.B.M. Victoria S.r.l. of Rho (MI).
scuola pianella
asilo pianella

October 2020 – February 2021

Final/detailed design, works supervision, health and safety coordination during the construction phase, cost accounting, SCIA (notification to the Fire Brigade), Certificate of Satisfactory Completion, and technical and administrative inspection for fire safety compliance at the nursery, primary and secondary schools in Cerratina, a hamlet of Pianella (PE).

September 2020 – October 2020

[PA] Consultancy services provided to Mr Vivaldo De Marinis, Engineer, for the detailed design of a fire detection and evacuation system as part of the fire safety upgrade of the Ortona (CH) hospital.
ospedale gaetano bernabeo ortona

April 2020 – June 2020

[PA] Detailed design of emergency lighting and safety coordination during the design phase to bring the emergency lighting levels into compliance with the fire safety technical standard at the Ortona (CH) hospital.

cantieri toto

December 2019

Final design of a ventilation system for tunnel excavation works and a fire-extinguishing system using hydrants for the Toto construction site base camp in Cefalù (PA), on behalf of Mr Paolo Di Matteo.

May 2018

Final design of a fire-extinguishing system comprising hydrants serving two industrial plants in Sinalunga (SI) on behalf of Mr Paolo Di Matteo.

December 2016 – January 2017

Project management for the construction of Lots II and III of the hydrant fire-extinguishing system and the restoration of fire safety systems at the Hapimag Resort in Scerne di Pineto (TE) on behalf of Mr Paolo Di Matteo.

July 2016

[PA] Detailed design of mechanical systems (air conditioning, water supply and fire-extinguishing systems) for a new office building housing the Provincial Headquarters and Station Command of the Forestry Service, located in L'Aquila (AQ), on behalf of LANDBAU srl.

May 2016 – February 2017

Consultancy services provided on behalf of Omnia Servitia for the renewal of fire safety documentation for the hospital facilities of ASL02 Lanciano-Vasto-Chieti.

January – April 2016


Project management for the construction of Lot I of the hydrant fire-extinguishing system and the restoration of fire safety systems at the Hapimag Resort in Scerne di Pineto (TE) on behalf of Mr Paolo Di Matteo.
comando provinciale comando stazione forestale

August 2015

[PA] Final design of mechanical systems for air conditioning, water supply and fire-extinguishing systems for the newly constructed office building housing the Provincial Headquarters and Station Command of the Forestry Service, located in L'Aquila (AQ), on behalf of LANDBAU srl.

condominio mara

February – March 2015

Design of a mechanical ventilation system for a car park, for a fire service exemption application, at the Mara Block of Flats in Ortona (CH), on behalf of Mr Vivaldo De Marinis.
resort hapimag

November–December 2014


Design of a hydrant-based fire-extinguishing system and fire safety system refurbishment for the Hapimag Resort in Scerne di Pineto (TE) on behalf of Mr Paolo Di Matteo.
hotel ideale
passegiata orientale

September 2014

Consultancy on fire safety compliance for the Hotel Ideale in Ortona (CH).

Land registry procedures for private individuals in Ortona (CH), internal alterations to a flat, merging of cellars to create a garage, and change of use from cellar to garage.

gaema costruzioni

August 2014

Preparation of the CERT-REI report for the steel structure of the Affori Centre in Milan (MI) on behalf of Gaema Costruzioni.
opercoop sambuceto

March 2014

Detailed design of the fire-extinguishing system for the extension to the Ipercoop store in Sambuceto (PE).

Thermal calculations (determination of winter and summer heating and cooling requirements), energy performance certification and preparation of the technical report in accordance with Law 10/91 for the Ipercoop store in Sambuceto (PE).

February 2014

Final design of the smoke and heat extraction system for the Saipem plant in Porto Torres (SS).

January – April 2014

Thermal calculations (determination of winter and summer heating and cooling requirements), detailed design of the HVAC system, fire suppression systems and smoke and heat extraction systems for the Saipem plant in Ferrara (FE).

December 2013

Detailed design of the fire-extinguishing system at the former Decathlon site in Sambuceto (PE).

September – December 2013

Management of construction sites and liaising on the construction of the Montanelli building and Tower U7, and liaising with IULM regarding the Moncucco project.

Detailed design for the ventilation and fire-suppression systems serving the excavation works for the Sparvo tunnel, part of the Florence–Bologna bypass, carried out by Toto S.p.A.

garages torre u7

April 2013

Detailed design of a dry-pipe sprinkler fire-extinguishing system for the garages of Tower U7 on Via Pirelli in Milan (MI).
cinema uci villesse
cinema uci

March 2013

Final design of the mechanical, air-conditioning, water supply, drainage and fire-extinguishing systems for the UCI cinema in Villesse (GO).

December 2012

Detailed design of mechanical systems, air conditioning, drainage and fire-extinguishing systems for the Fiumicino Outlet, Rome (RM).

November 2012

Detailed design of mechanical systems, drainage, irrigation and fire-extinguishing systems for the nursery and secondary schools in the Massimina district of Rome (RM).
facolta informatica milano

September 2012

Detailed design of a fire-extinguishing system for the tender to build the new University Campus for the Faculty of Computer Science in Milan (MI).
centro commerciale valle aurelia

September 2011

Detailed design of the fire-extinguishing systems and the rainwater and sewage disposal systems for the Valle Aurelia Shopping Centre in Rome (RM).
la city pescara

January 2012

Detailed design of the fire-extinguishing system for the La City business centre in Pescara (PE).
le varesine milano

March 2011

Responsible for the mechanical design at the construction stage of the fire-extinguishing, ventilation and groundwater systems serving the newly built 'Le Varesine 2' residential complex in Milan (MI).
tbm martina

October 2010

Mechanical design of the fire-extinguishing system for the "Martina" TBM, used for the excavation of the Sparvo tunnel – a variant of the Florence–Bologna route – carried out by Toto S.p.A.

January 2010 – June 2010

Construction supervision and commissioning work, carried out in collaboration with Ansaldo Energia's commissioning team, for the 800 MW combined-cycle power station at Turano Lodigiano (LO), built by Ansaldo Energia on behalf of Sorgenia, covering the installation of deluge, pre-action, hydrant systems and CO₂ and HFC-227 gas systems in accordance with NFPA standards, as well as the HVAC ventilation system.
centrale turano lodigiano

Year 2007/08

Responsible for the structural design of deluge, pre-action, hydrant, CO₂ and HFC-227 fire-extinguishing systems in accordance with NFPA standards for the construction of the 800 MW combined-cycle power station at Turano Lodigiano (LO), built by Ansaldo Energia on behalf of Sorgenia.