System Design

[PA]: Public Administration.

August 2025 – December 2025

[PA] Project management for extraordinary maintenance works on two fire-fighting pump units for the hydrant network serving the primary, secondary and nursery schools in Pianella town centre (PE).
mercato ittico porto ortona

August 2024 – December 2025

[PA] Preparation of the detailed mechanical and electrical engineering design in RTP format for the energy refurbishment of the state-owned building housing the fish market at the port of Ortona (CH).

April 2025

Consultancy services for the verification of calculations and the selection of a pump unit for a hydrant-based fire-extinguishing system serving the DSB in Viale De Gasperi, San Salvo (CH).

April 2025

Preparation of a technical report in accordance with Law 10/91, thermal calculations (summer and winter requirements) and preliminary design of an air-conditioning system for the refurbishment of existing premises and the creation of a flat situated in Via Selva degli Abeti, Pescara (PE).

April 2025

Preparation of a technical report and handling of a claim arising from the non-compliant installation of a boiler in a flat at 9 Via Sapienza, Ortona (CH).
museo cascella pescara

December 2024

Preparation of the final design for fire safety, emergency lighting, EVAC, smoke detection and ventilation for the Cascella Museum, situated at Viale G. Marconi, 45, Pescara (PE), on behalf of Avilo Engineering srl.
mercato coperto ortona

May 2024

Final/detailed design, including a technical report in accordance with Law 10/91, covering water supply, drainage, ventilation and air-conditioning systems for the conversion of part of the covered market in Via Ciampoli, Ortona (CH), into office space.

April 2024

Preparation of an INAIL claim form for the heating plant at the "La Conchiglia" block of flats, situated at Via Santa Brigida, 3, Ortona (CH).

January 2024

Technical consultancy on behalf of a party in relation to rainwater drainage for the purposes of mediation.
polo infanzia ferrara
polo infanzia comacchio ferrara

November 2023

[PA] Detailed design of mechanical primary air ventilation systems for PNRR Mission 4: education and research, in support of the construction of a new childcare centre in Comacchio – Ferrara (FE) on behalf of LANDBAU srl.
scuola infanzia campus scolastico castel di sangro
scuola infanzia castel di sangro

November 2023

[PA] Detailed design of mechanical systems for primary air renewal and VRF air conditioning for PNRR Mission 4 – education and research, in support of the construction of a new building to be used as a nursery school within the area designated as a school campus – Castel Di Sangro (AQ), on behalf of Landbau srl.
istituto tecnico industriale l da vinci lanciano
istituto tecnico industriale lanciano

November 2023

[PA] Consultancy services for the detailed design of mechanical systems under the PNNR Mission 4: Education and Research – Seismic retrofitting of a new building through on-site replacement of Block 4 of the "L. Da Vinci" Technical and Industrial Institute, located at Via Guido Rosato, 5 – Lanciano, on behalf of LANDBAU srl.

October 2023

Expert witness evidence in criminal proceedings No. R.G. 5371/2022 before the Court of Pescara concerning an accident involving an LPG installation in Scafa (PE).

October 2023

Preparation of the detailed design for a 66 kW gas installation serving a residential property at 7/11 Via San Silvestro, L'Aquila (AQ).
scuola materna cso sergio cosmai bisceglie
scuola materna bisceglie

May 2023 – June 2023

[PA] Thermal calculations (summer and winter heat demand), drafting of a technical report in accordance with Law 10/91, Energy Performance Certificate, and final/detailed design of mechanical and fire-extinguishing systems for a nursery school as part of the PNRR scheme on Corso Sergio Cosmai in Bisceglie (BT) on behalf of LANDBAU srl.

May 2023 – June 2023

Preparation of a technical report in accordance with Law 10/91, Energy Performance Certificate, final design of air-conditioning systems and coordination of health and safety during the construction phase for extraordinary maintenance works on a flat at Via Monte Romanella, 22 – Pescara (PE).

January 2023 – February 2023

Final design of the gas system serving the kitchen, with a capacity of 77 kW, comprising a 28 kW external boiler and a 23 kW internal boiler for Sporting Club SSD arl, Francavilla al Mare (CH).

January 2023 – February 2023

Assignment to assist the Project Manager (RUP) with activities falling within the remit of the Project Manager and the Head of the Urban Planning and Construction Department, as well as safety matters relating to building services for the Municipality of Scafa (PE).
villetta bifamiliare pescara

September 2022

Preparation of energy performance certificates before and after works; preparation of documents in accordance with the former Law 10/91; final design of mechanical and electrical systems and related bills of quantities, with a view to obtaining tax relief through the 110% Superbonus scheme for a semi-detached house situated at Via Tiburtina Valeria 286, Pescara (PE).
mizzica montesilvano

May 2022 – June 2022

Detailed design of a gas installation for a kitchen with a capacity of 50 kW for the "Mizzica" restaurant, located at Corso Umberto I, 314, Montesilvano (PE).
palazzina bs11 milano

June 2021 – September 2021

Survey and graphical representation of mechanical installations for the purposes of removal and modernisation (strip-out of mechanical systems) of the mechanical installations in the BS11 building at Via Battistotti Sassi, 11, Milan (MI), on behalf of Progem srl.
ricostruzione abitazione fonte dell olmo montesilvano
ricostruzione abitazione montesilvano

June 2021 – September 2021

Final/detailed design for the specification of opaque and transparent building components, passive acoustic requirements, mechanical systems and a report pursuant to Law 10/91 for a project eligible for the 110% 'superbonus', involving the demolition and reconstruction of a dwelling situated in C.da Fonte dell'Olmo, Montesilvano (PE).

June 2021

Drafting of Declarations of Conformity for the electrical, heating and plumbing systems of a flat at 4 Via Vomano, Francavilla al Mare (CH).

May 2021

Electrical system testing – Circolo 1923 in Piazza Laudi, Pescara (PE).
jrc research centre ispra

April 2021

Certificates of compliance for the electrical installation in Building 48 and Area 35F at the JRC Research Centre, Ispra (VA).

March 2021

Electrical system testing – Rostelle & Co. in Piazza Laudi, Pescara (PE).

January 2021 – November 2021

Preparation of construction drawings and as-built drawings for electrical distribution trunking for cleanrooms at a facility in Milan (MI) on behalf of Progem srl.
ristoranre pescara

October 2020

Detailed design for a 114 kW kitchen gas system serving a restaurant located in Piazza le Laudi, Pescara (PE).
edificio residenziale ripacorbaria

January 2020 – April 2020

Final/detailed design of mechanical systems and energy-related documentation for a residential building situated in Ripacorbaria, Manoppello (PE).

October 2019

Final design for the refurbishment of the vehicle access area and the upgrading of the black and grey water disposal system for the block of flats at 20 Via Sele, Montesilvano (PE).
condominio via donatello pescara

January 2019 – December 2019

Detailed design and site supervision for the energy-efficiency refurbishment of the heating plant and the installation of individual metering systems for a block of flats situated at 36 Via Donatello, Pescara (PE).

December 2018

Technical certification and authorisation documents for the preparation of the Certified Certificate of Occupancy for a commercial warehouse used as a state-run monopoly, situated in Sambuceto (CH).
stella maris

September 2018

[PA] Detailed design of mechanical systems for Lots II and III as part of the redevelopment of the Stella Maris holiday camp in the countryside near Montesilvano (PE), on behalf of LANDBAU srl.

July 2018 – August 2018

Thermal calculations (summer and winter requirements), drafting of a technical report in accordance with Law 10/91, and design of a controlled mechanical ventilation (CMV) system for a major first-level refurbishment, covering both structural and services works, for a flat located in Francavilla (PE).

April 2018 – March 2019

Thermal calculations (summer and winter requirements), drafting of a technical report in accordance with Law 10/91, and design of an air-conditioning system for a major first-level refurbishment – covering both building works and services – for a flat located in Ortona (CH).

April 2018 – March 2019

Thermal calculations (summer and winter requirements), drafting of a technical report in accordance with Law 10/91, and design of a controlled mechanical ventilation (CMV) system for a major first-level refurbishment – covering both building works and services – of a penthouse flat in Pescara (PE). 
quartiere fontanelle

April 2018 – March 2019

[PA] Detailed design for a rainwater drainage system as part of the regeneration of public spaces and road networks in the Fontanelle district (PE), on behalf of Mr Michelino Rossi.

gelateria venezia

January 2018

Thermal calculations (calculation of summer and winter heating and cooling requirements), drafting of a technical report in accordance with Law 10/91, and design of a controlled mechanical ventilation (CMV) system as part of the refurbishment of the services for a premises used as an ice-cream parlour in Venice, located in Tortoreto (TE).

October 2016

[PA] Participation in a public tender for the final/detailed design of mechanical systems for the contract to demolish and rebuild the school building housing the "Tommaso da Celano" lower secondary school in Celano (AQ) on behalf of LANDBAU srl.

October 2016

Technical report commissioned by the Magna Quies block of flats in Chieti (CH) in support of legal proceedings concerning issues relating to disconnection from the block's central heating system.

August 2016

Detailed design of a ventilation and air-conditioning system for the construction of a cooking laboratory at the Whirlpool plant in Melano (AN) on behalf of Mr Paolo Di Matteo.

August 2016

Design and site supervision for the construction of a sewerage collection system for a private residence situated in Via Ancona, Spoltore (PE).

July 2016

[PA] Detailed design of mechanical systems (air conditioning, water supply and fire-extinguishing systems) for a new office building housing the Provincial Headquarters and Station Command of the Forestry Service, located in L'Aquila (AQ), on behalf of LANDBAU srl.

July – November 2016

[PA] Detailed design of mechanical systems, including water supply, black and grey water disposal, ventilation and air conditioning, for a new-build building to be used as accommodation for the fire station in Montelibretti (RM), on behalf of Mr Guido Carletti.

whirlpool melano

May – July 2016

Detailed design of a ventilation and air-conditioning system for the construction of the 'Affidatezza' laboratory at the Whirlpool plant in Melano (AN), on behalf of Mr Paolo Di Matteo.

November–December 2015

[PA] Participation in a public tender for the preparation of detailed engineering designs for building services and the execution of works to restore and enhance the area known as Borghetto Flaminio – the former ATAC building.

[PA] Participation in a complex integrated public tender for the preparation of detailed engineering designs for building services and the execution of works to restore the Stella Maris holiday camp in the countryside near Montesilvano (PE).

October 2015

Thermal calculations (determination of winter and summer energy requirements), drafting of a technical report in accordance with Law 10/91, Energy Performance Certificate, and final design of mechanical, water supply, drainage and air-conditioning systems for a private villa situated in San Silvestro (PE) on behalf of Engineer Eleonora Sablone.
comando provinciale comando stazione forestale

August 2015

[PA] Final design of mechanical systems for air conditioning, water supply and fire-extinguishing systems for the newly constructed office building housing the Provincial Headquarters and Station Command of the Forestry Service, situated in L'Aquila (AQ), on behalf of LANDBAU srl.

August 2015

Design of the water and heating systems for a new house in San Giovanni Teatino (CH) on behalf of Architect Luigi Di Benedetto.
cc megalo

July 2015

Detailed design for a sewage disposal system for the Megalò shopping centre, Santa Filomena, Chieti Scalo (CH), on behalf of Engineer Michelino Rossi.

February – March 2015

Di.Ri. has drawn up the plans for the electrical installation at commercial premises at 9 Via Cadolini, Ortona (CH).
scuola palestra dosso

February – March 2015

[PA] Final design of mechanical systems for the construction of the school and sports hall in Dosso, Municipality of Sant'Agostino (FE), on behalf of LANDBAU srl.

January – February 2015

Thermal calculations (determination of winter and summer heating and cooling requirements), energy performance certification and preparation of the technical report in accordance with Law 10/91, design of an underfloor radiant panel heating and cooling system, and verification of passive acoustic requirements for private houses in Montesilvano (PE).

January – February 2015

Detailed design of a 115 kW kitchen gas system for the Attortellati restaurant (GR) on behalf of Mr Paolo Di Matteo, Engineer.
deutsche bank

August 2014

Plant engineering due diligence for Deutsche Bank branches in southern and central Italy, on behalf of J&A Consultants (Milan).
cinema the space

May – June 2014

Plant engineering due diligence for The Space cinema venues in southern and central Italy, on behalf of J&A Consultants.

January – April 2014

Thermal calculations (determination of winter and summer heating and cooling requirements), detailed design of the HVAC system, fire suppression systems and smoke and heat extraction systems for the Saipem plant in Ferrara (FE).

January 2013

Thermal calculations (determination of winter and summer requirements) and detailed design of the air-conditioning system for the Saipem Val D'Agri (PZ) plant.
palazzo montanelli

Luglio 2013

Detailed mechanical, plant and architectural design for the major refurbishment of the roof of Palazzo Montanelli in Piazza Montanelli, Sesto San Giovanni (MI).
cinema uci villesse
cinema uci

March 2013

Final design of the mechanical, air-conditioning, water supply, drainage and fire-extinguishing systems for the UCI cinema in Villesse (GO).
alloggi studenti universita
alloggi studenti universita iulm

February 2013

Detailed mechanical and architectural design for the construction of student accommodation on behalf of IULM University, at Cascina Moncucco, Via Moncucco, near Milan (MI), with a view to securing funding from the MIUR.

December 2012

Detailed design of mechanical systems, air conditioning, drainage and fire-extinguishing systems for the Fiumicino Outlet, Rome (RM).

November 2012

Detailed design of mechanical systems, drainage, irrigation and fire-extinguishing systems for the nursery and secondary schools in the Massimina district of Rome (RM).

October 2012

Design of plant engineering improvements for the tender to construct the Guardia di Finanza building in Arezzo (AR).

June 2012

Detailed engineering design for the mechanical and electrical systems as part of the major refurbishment of the Sara Assicurazioni residential building in Rome (RM).
quartiere residenziale tiburtino roma

April 2012

Detailed design of the building services for the Tiburtino residential estate in Rome (RM).
centro commerciale valle aurelia

Settembre 2011

Detailed design of the fire-extinguishing systems and the rainwater and sewage disposal systems for the Valle Aurelia Shopping Centre in Rome (RM).
le varesine milano

March 2011

Responsible for the mechanical design at the construction stage of the fire-extinguishing, ventilation and groundwater systems serving the newly built 'Le Varesine 2' residential complex in Milan (MI).
centrale aprilia

July 2010

Responsible for the mechanical design at the construction stage of the HVAC system for the 800MW combined-cycle power station in Aprilia (LT), built by Ansaldo Energia for Sorgenia.
da vinci center roma

July 2009

Head of mechanical systems design for the Da Vinci Centre complex, situated in the Fiumicino area of Rome (RM).