Safety on building sites

[PA]: Public Administration.

June 2025 – December 2025

Safety Coordination during the Design and Construction phases for the refurbishment of a flat on the mezzanine floor of a building at 53 Via Botticelli, Pescara (PE).
appartamento residenziale viale regina margherita pescara

April 2024

Safety Coordination during the design and execution phases for extraordinary maintenance works on a flat on the 5th floor of a residential building situated at Viale Regina Margherita, 27, in Pescara (PE).

March 2024

Safety Coordination during the design and construction phases for the refurbishment of a residential building situated at C.da Riccio, 42 in the municipality of Ortona (CH).

December 2023

Preparation of a technical report in accordance with Law 10/91, Energy Performance Certificate, and safety coordination during the construction phase (CSE) for the extension of a flat situated at Via Trento, 24, in Pescara (PE).

May 2023 – June 2023

Preparation of a technical report in accordance with Law 10/91, Energy Performance Certificate, final design of air-conditioning systems and coordination of health and safety during the construction phase for extraordinary maintenance works on a flat at Via Monte Romanella, 22 – Pescara (PE).
abitazione manoppello

November 2020 – May 2021

Safety coordination during the execution phase for works carried out under the Superbonus scheme on a property situated at 9 Via Sulmona, Manoppello (PE).
scuola pianella
asilo pianella

October 2020 – February 2021

Final/detailed design, site supervision, health and safety coordination during the construction phase, cost accounting, SCIA (Notification of Commencement of Works) to the Fire Service, Certificate of Satisfactory Completion, and technical and administrative acceptance testing for the fire safety compliance works at the nursery, primary and secondary schools in Cerratina, a hamlet of Pianella (PE). 
ospedale gaetano bernabeo ortona

April 2020 – June 2020

[PA] Detailed design of emergency lighting and safety coordination during the design phase to bring the emergency lighting levels into compliance with the fire safety technical standard at the Ortona (CH) hospital.

February 2018 – March 2018

Project management and health and safety coordination during the construction phase for architectural, structural and services works relating to extraordinary maintenance of residential and commercial properties, funded by the 2009 earthquake and 2013 flood relief schemes, located in Turrivalignani (PE).